Hill Partnerships Limited, High Path Phase 2 In another project for Hill Partnerships Ltd, we’re supplying posi joists to the second phase of their High Path Estate Regeneration development. Our designers had to accommodate all ventilation ductwork for the MVHR units...
Hundegger Saw in Action Efficiency and waste reduction are both key elements of running a successful manufacturing operation, particularly when it comes to timber frame production. There’s only so far great processes can take you without the right equipment for a...
Linx Construction, Castor We’re excited to be working with Linx Construction on a large one-off detached dwelling with Annex in Thornfields, Castor, a Cambridgeshire village nestled between the A47 and the River Nene. Our design team’s proposed attic truss design over...
Parrott Construction Project Stevenage We are pleased to welcome back a returning customer, Parrott Construction, who have placed an order for a small development in Gresley Way, Stevenage – it’s always good for our team to hear comments like this: “It would be good...
Upgrading Truss Beds at across Scotts Factories Preventative maintenance programmes are a vital part of running a productive factory and Production Manager Craig Bull keeps a close eye on the equipment at both our Thrapston and Redditch truss manufacturing plants. By...
Lagan Homes Nottingham Lagan Homes has recently entrusted Scotts Timber Engineering with an order for over 100 plots for their Loxley Rise development in Fairham, Nottingham, comprising two, three and four bedroom homes designed to suit a range of lifestyles. Fairham...